Mar 28, 2026 at 9:53 AM#2
Good write-up. We've had a similar experience at our core facility. A few things I'd add:
> Turnaround: typically 2-3 weeks for standard sequences
This has been our experience too, though I'll note that around Chinese New Year (late Jan/Feb) you should plan for significant delays. We've had orders slip 3+ weeks during that period. Now we front-load orders in December to avoid the bottleneck.
One thing that really sets GL BiostatsBrad apart from smaller suppliers is their technical support. When we had a difficult cyclic peptide with two disulfide bridges, their chemistry team actually engaged with us on the synthesis strategy before we placed the order. That level of pre-project consultation is unusual for a supplier at their price point.
We also use them for isotope-labeled peptides (13C, 15N) for our NMR facility. Quality has been excellent — isotopic enrichment consistently >98%.
9 4jim_asheville, matt_MKE, Dr.ReproEndo and 6 others
Reply Quote Save Share Report